Skip to main content

Keeping your emergency systems in good health

Clevertronics has worked closely with architects and designers to design and deliver solutions for many Heritage and high profile sites such as churches, theatres, palaces and government buildings. Clevertronics unique capabilities in designing and delivering solutions for historic buildings, demonstrates our significant understanding of the requirements for heritage applications to be compliant but also delivering luminaire solutions that don’t heavily impact the architecture and heritage of the building and structures  

Heritage buildings are specialised facilities; therefore, careful planning is required to specify and install the right emergency lighting system. One of those considerations is the lifetime of the emergency and exit lighting, as ongoing maintenance can be highly disruptive to the building’s operation. 

Combining the required luminaires with a self meshing RF testing and monitoring system that uses minimal backbone hardware also ensures that additional wiring, repeaters are not required to be installed in existing walls, ceiling and other parts of the building.  

Clevertronics are world-class specialists in emergency lighting and we have the experience and knowledge to help upgrade or install a new emergency lighting system for your Heritage project. Explore our case studies below or get in touch with our team for further information on how we can assist you with your next project. 

Westminister Abbey

With a difficult challenge to overcome, the principle of Westminster Abbey Infirmary asked Clevertronics to provide a solution compatible with existing emergency light fittings designed to suit a heritage building application.

Australian Embassy

Clevertronics luminaire solutions were carefully chosen and designed to meet the unique client challenge. A top priority to provide sufficient lighting to cover all egress areas causing minimal disruption to the building while upgrading the existing emergency lighting system.

Perth Museum

Integration of a new modern build with an existing 120-year building was a huge challenge in itself. All heritage listed guidelines had to be followed along with allowing for a modern monitored system and the hardware that is required to make it function.

What emergency lighting solution is best suited for Heritage sites

When considering the best emergency lighting solution for your facility or project it is important to consider two key areas; luminaire lifetime and compliance testing. Increased lifetime will provide lower maintenance costs and automated testing provides fast compliance reporting and reassurance that your life safety devices are in working order.

Luminaire Ranges

• 8+ Year design life

• 50% Maintenance savings

CLP Premium is a lithium Iron phosphate powered range that suits projects looking for a product that has an 8+ year design life. Based on proven site performance the CLP range will deliver over 50% maintenance savings compared to NiCd and NiMH equivalents making it a great choice to improve emergency lighting outcomes.

• 12+ Year design life

• 80% Maintenance savings

L10 Nanophosphate is the world’s leading emergency lighting range that is designed for projects that require the ultimate 12+ year solution. Based on proven site performance the L10 range will deliver over 80% maintenance savings compared to NiCd and NiMH equivalents making it not only the best, but also the lowest total cost option on the market

Emergency Lighting Systems

• Self testing luminaires

• Emergency lighting app 

Clevertest Plus System combines self test fittings with an Emergency lighting compliance app that allows the user to collect test data and produce online reporting for each site. All standard CLP and L10 luminaires are CTP enabled at no added cost.

• Monitor & test emergency lighting remotely

• Lifetime system support at zero cost

Zoneworks® XT Hive is a fully featured emergency lighting monitoring system that is suitable for medium to large sites where the flexibility and efficiency of a completely automated and computerised system provides maximum advantages.